Mildenhall Menu Link
Ely Group of Internal Drainage Boards
The Drainage Office, Main St, PRICKWILLOW, Nr Ely, Cambridgeshire, CB7 4UN
The maintenance programme for this coming winter 2021/22 is as follows:-
Drain No. | Drain | Length |
---|---|---|
M21 | Catchwater Drain | 21 |
M22 | Double Ditch | 40 |
M23 | Sewage Drain | 106 |
M24 | Baldwins Lode (Upper) | 340 |
M25 | Catchwate Drain | 284 |
M26 | Catchwater Drain Extension | 88 |
TOTAL | 879ch (17.58km) |
All works will be carried out in accordance with the Board’s Conservation Statement.