The maintenance programme recommended for consideration for 2009/10 is as follows:-

 

Number

Drain

Chs

P4
Lots Drain/Bells Ditch
146
P5
Upper Padnal Main Engine Drain
77
P6
Commonlands/Second Drove
94.5
P7
Third Drove Spur
18.5
P8
Branch Drain
70.5
P9
Siding Drain
18
P10
Trinity Ditch
67
P11
Police Ditch
24
P18
Turbutsea Ditch
26.5

 

TOTAL

542 chs (10.84km)

             

All works will be carried out in accordance with the Board’s Conservation Statement.