The maintenance programme recommended for consideration for winter 2009/10 is as follows:-
No
Drain
Length Km
TOTAL
44.48km
It should be noted that the programme includes Oxlode Main Drain (D06).
All works will be carried out in accordance with the Board’s Conservation Statement.