Ely Internal Drainage Boards

Ely Group of Internal Drainage Boards

The Drainage Office, Main St, PRICKWILLOW, Nr Ely, Cambridgeshire, CB7 4UN

Mildenhall Works Programme

The maintenance programme recommended for this coming winter 2018/19 is as follows:-

Drain No.DrainLength
TOTAL421ch (8.42km)
M09Baldwins Lode (part)58
M15Old Engine Drain153
M17Beck Row Division (Lower)55
M18Beck Row Division (Upper)136
M19Beck Row Spur19

All works will be carried out in accordance with the Board’s Conservation Statement.