Burnt Fen Works Programme

The maintenance programme proposed for 2018/19 in accordance with the Board’s long term programme is as follows:-

Drain No.DrainLength
TOTAL724.6ch (14.57km)
B13Station Dyke93.0
B14Elderberry Drain119.0
B15Sedge Fen Drain134.0
B16Russell Farm Dyke28.0
B17Cross Bank Drain107.0
B18Dragons Dyke48.5
B19Mannings Dyke10.1
B20Mildenhall Road No. 287.5
B37Mannings New Cut97.5

All works will be carried out in accordance with the Board’s Conservation Statement.